2,156 researchers have collaborated in publishing 774 papers supproted by UK Catalysis Hub
Publications |
---|
Title: Cobalt atom sites anchored on sulfhydryl decorated UiO-66 to activate peroxymonosulfate for norfloxacin degradation Year: 2023 Authors (9): H. Wang, C. Wang, X. Wang, Q. Chen, S. Liu, R. Cai, S. J. Haigh, Y. Sun, D. Yang Publisher: NA DOI: 10.1016/j.jece.2022.108972 journal-article Themes: Circular Economy (2023) |
Title: On the transition to gasoline-to-olefins chemistry in the cracking reactions of 1-octene over H-ZSM-5 catalysts Year: 2023 Authors (7): A. P. Hawkins, A. Zachariou, S. F. Parker, P. Collier, N. S. Barrow, R. F. Howe, D. Lennon Publisher: NA DOI: 10.1016/j.apcata.2023.119442 journal-article Themes: New Catalysts (2023) |
Title: XPS surface analysis of ceria-based materials: Experimental methods and considerations Year: 2023 Authors (6): M. A. Isaacs, C. Drivas, R. Lee, R. G. Palgrave, C. M. A. .Parlett, D. J. Morgan Publisher: NA DOI: 10.1016/j.apsadv.2023.100469 journal-article Themes: New Catalysts (2023) |
Summary | |
---|---|
Citations | 27,581 |
Average: | 35.63 |
Maximum: | 2114 |
Minimum: | 0 |
Journal | Publications |
---|---|
ACS Catalysis | 59 |
Physical Chemistry Chemical Physics | 35 |
ChemCatChem | 32 |
Journal of the American Chemical Society | 28 |
Angewandte Chemie International Edition | 27 |
Catalysis Science & Technology | 26 |
Doctoral Thesis | 24 |
Topics in Catalysis | 21 |
Faraday Discussions | 21 |
Dalton Transactions | 20 |
Publisher | Publications |
---|---|
Royal Society of Chemistry (RSC) | 199 |
American Chemical Society (ACS) | 171 |
Wiley | 123 |
Elsevier BV | 119 |
Springer Science and Business Media LLC | 51 |
MDPI AG | 18 |
The Royal Society | 17 |
University College London | 14 |
Springer Nature | 13 |
Informa UK Limited | 5 |
Summary | |
---|---|
Publishers | 34 |
Average: | 22.76 |
Maximum: | 199 |
Minimum: | 1 |
Groups | Publications |
---|---|
1-5 | 25 |
11-15 | 2 |
16-20 | 2 |
more than 20 | 5 |
Title | Year | Status |
---|
The actions below are scheduled and processed in the background
Verify CR changes
Upload CSV file list