2,118 researchers have collaborated in publishing 760 papers supproted by UK Catalysis Hub
Publications |
---|
Title: The highly surprising behaviour of diphosphine ligands in iron-catalysed Negishi cross-coupling Year: 2018 Authors (12): A. M. Messinis, S. L. J. .Luckham, P. P. Wells, D. Gianolio, E. K. Gibson, H. M. O’Brien, H. A. Sparkes, S. A. Davis, J. Callison, D. Elorriaga, O. Hernandez-Fajardo, R. B. Bedford Publisher: Nature Catalysis DOI: 10.1038/s41929-018-0197-z article-journal Themes: Transformations (2019), BAG (2019) |
Title: Hybrid Catalysts for Other C-C and C-X Bond Formation Reactions Year: 2018 Authors (4): P. J. Deuss, M. V. Doble, A. G. Jarvis, P. C. J. .Kamer Publisher: Artificial Metalloenzymes and MetalloDNAzymes in Catalysis DOI: 10.1002/9783527804085.ch10 chapter Themes: Environment (2018) |
Title: Study of CO2 permeation in Zn2+‐modified Al2O3‐carbonate membrane Year: 2023 Authors (2): L. Qu, E. I. Papaioannou Publisher: Journal of the American Ceramic Society DOI: 10.1111/jace.19216 journal-article Themes: Water-Energy (2023) |
Summary | |
---|---|
Citations | 26,471 |
Average: | 34.83 |
Maximum: | 1993 |
Minimum: | 0 |
Journal | Publications |
---|---|
ACS Catalysis | 59 |
Physical Chemistry Chemical Physics | 33 |
ChemCatChem | 31 |
Journal of the American Chemical Society | 28 |
Angewandte Chemie International Edition | 27 |
Catalysis Science & Technology | 26 |
Doctoral Thesis | 24 |
Topics in Catalysis | 21 |
Faraday Discussions | 21 |
Dalton Transactions | 20 |
Publisher | Publications |
---|---|
Royal Society of Chemistry (RSC) | 194 |
American Chemical Society (ACS) | 169 |
Wiley | 122 |
Elsevier BV | 115 |
Springer Science and Business Media LLC | 49 |
MDPI AG | 18 |
The Royal Society | 17 |
University College London | 14 |
Springer Nature | 13 |
Informa UK Limited | 5 |
Summary | |
---|---|
Publishers | 34 |
Average: | 22.35 |
Maximum: | 194 |
Minimum: | 1 |
Groups | Publications |
---|---|
1-5 | 25 |
11-15 | 2 |
16-20 | 2 |
more than 20 | 5 |
Title | Year | Status |
---|
The actions below are scheduled and processed in the background
Verify CR changes
Upload CSV file list